Unit F Designers' Support

Project Development

Production for Fashion Designers

project management

Carina Heinz

E: [email protected]

 

> more
A structure analysis based on a survey conducted among Austrian fashion designers in 2006 as well as the ongoing contact with designers have revealed that the local production conditions are inadequate and that designers have problems producing their collections in Austria. Based on these results Unit F, supported by austria wirtschaftsservice (aws), initiated a project aiming to improve the production facilities.
 
As part of this project, the specific demands of fashion designers are collected and compared with the available supply provided by manufacturers. Existing structures are taken into consideration and strengthened by the additional demand. Possible new production facilities should be created for demands which so far cannot be met. This is to counteract the structural deficiencies constraining the growth in the entire field of contemporary fashion design.
 
To be able to sufficiently analyse the demand and current supply we would like to ask both, fashion designers and manufacturers, to fill out and submit the questionnaires you can download from this page.
 
PROJEct partner

                                                       

project period

February-September 2009

 

detailed information

For detailed information please contact the German version of the Unit F website or contact Carina Heinz.